Cement Plant Reduces Costs while Lowering Carbon Footprint
After installation the plant confirmed that CO emissions were reduce over 70%, with a 22% increase in non-fossil fuel substitution. Return on investment was less than 6 month payback.
After installation the plant confirmed that CO emissions were reduce over 70%, with a 22% increase in non-fossil fuel substitution. Return on investment was less than 6 month payback.
After startup the refinery confirmed a 75% reduction in panel operator intervention and a 4% increase in maximum throughput.
TRI’s technology was deployed at Fulcrum BioEnergy’s Sierra BioFuels Plant, which converts ~175,000 tons of landfill waste into renewable, transportation fuels with 80% lower carbon emissions.